Search for dissertations about: "finite element analysis of bridge girder"
Showing result 1 - 5 of 9 swedish dissertations containing the words finite element analysis of bridge girder.
-
1. Bridge Monitoring to Allow for Reliable Dynamic FE Modelling : A Case Study of the New Årsta Railway Bridge
Abstract : Today’s bridge design work in many cases demands a trustworthy dynamic analysis instead of using the traditional dynamic amplification factors. In this thesis a reliable 3D Bernoulli-Euler beam finite element model of the New Årsta Railway Bridge was prepared for thorough dynamic analysis using in situ bridge monitoring for correlation. READ MORE
-
2. Structural assessment procedures for existing concrete bridges : Experiences from failure tests of the Kiruna Bridge
Abstract : Assessing existing bridges is an important task in the sustainable management ofinfrastructure. In practice, structural bridge assessments are usually conducted usingtraditional and standardised methods, despite knowledge that these methods oftenprovide conservative estimates. READ MORE
-
3. Shear and Torsion in Concrete Structures Non-linear Finte Element Analysis in Design and Assessment
Abstract : For structural design and assessment of reinforced concrete members, non-linear finite element analysis has become an important tool. However, design and assessment of shear and torsion are still done with simplified analytical or empirical design methods. READ MORE
-
4. Serviceability Limit State for Steel Girders during Bridge Launching - A Patch Loading Problem
Abstract : Incremental launching is a construction method in which bridge girders are first assembled in the vicinity of the future permanent position of the bridge. When the elements have been welded together the girders are launched to their permanent position. READ MORE
-
5. Assessment of Concrete Bridges : Models and Tests for Refined Capacity Estimates
Abstract : Optimising the strategy for repairing, upgrading and replacing bridges in the European Union, and elsewhere, is becoming increasingly important due to ageing of the bridge stock, continuously increasing load requirements and budgetary limitations. Thus, there is a clear need to identify or develop, and implement, refined methods for assessing existing bridges in order to determine the most cost-effective options and actions to extend their lives, increase their capacities or replace them. READ MORE