Advanced search

Showing result 1 - 5 of 105 swedish dissertations matching the above criteria.

  1. 1. Developing a collaborative planning tool for construction - A Building Information Model-enhanced planning and scheduling tool for production

    Author : Mikael Viklund Tallgren; Chalmers tekniska högskola; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; Collaborative planning process; BIM; Construction Informatics; Information Technology in construction; Design Science;

    Abstract : Construction projects are becoming increasingly complex with a higher degree of specialization, resulting in more sub-contractors as well as in more information needed in the project. This results in a bigger project organization with an increased need for information exchange, an area where construction has been criticized by academics. READ MORE

  2. 2. Collaborative production planning with BIM – Design, development and evaluation of a Virtual Production Planning system

    Author : Mikael Viklund Tallgren; Chalmers tekniska högskola; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; NATURVETENSKAP; NATURAL SCIENCES; NATURVETENSKAP; NATURAL SCIENCES; Construction Informatics; BIM; Construction IT; Scheduling; Collaborative Production Planning;

    Abstract : Construction projects have for a long time been characterized by increased specialization, low productivity, and a fragmented information exchange culture, resulting in inefficient work processes, with time delays and budget overruns. Research within the context of construction planning and scheduling and IT points to improving communication, collaboration, and cooperation to address these problems. READ MORE

  3. 3. Virtual reality in construction : tools, methods and processes

    Author : Stefan Woksepp; Luleå tekniska universitet; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Construction Engineering and Management; Byggproduktion;

    Abstract : Present-day construction projects are characterized by short-term partnerships between multidisciplinary teams with varying levels of process maturity and information handling capability. They involve the planning, design and erection of structures of all types. READ MORE

  4. 4. Between Daring and Deliberating : 3G as a Sustainability Issue in Swedish Spatial Planning

    Author : Stefan Larsson; Rättssociologiska institutionen; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; 3G; UMTS; spatial planning; sociology of law; sustainability issues; sustainable development; public participation; infrastructure development; the precautionary principle; fear of radiation; strategic decision-making; sociology of law; sustainable development; infrastructure development; strategic decision-making; fear of radiation; public participation; the precautionary principle; spatial planning; sustainability issues; UMTS; 3G;

    Abstract : The thesis shows how different aspects of sustainable development have been handled or not handled in the third generation infrastructure development in Sweden. The difference between the design of the 3G development – emphazising competition, growth and regional access, based on a strong technological optimism - and the implementation, as the roll out struck the landscape, including the non-handled radiation issue and the legal changes in order to facilitate the roll out, is discussed and analyzed. READ MORE

  5. 5. Construction site productivity measurements : selection, application and evaluation of methods and measures

    Author : Jan Jonsson; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Construction Engineering and Management; Byggproduktion;

    Abstract : A construction company consists of a number of different sites where the physical production is taking place. This production is not always performed in the best possible way. There are numerous things such as organisation, logistics, co-ordination, technique, quality and others that can be improved. READ MORE