Search for dissertations about: "Johan Spross"
Showing result 6 - 9 of 9 swedish dissertations containing the words Johan Spross.
-
6. Probabilistic time estimation in tunnel projects
Abstract : Transport infrastructure projects, including tunneling, suffer from timedelays and cost overrun. A literature review shows that the effect ofuncertainty has been neglected in explaining time and cost overrunmeaning that technical explanations matter. READ MORE
-
7. Managing uncertainties in geotechnical parameters : From the perspective of Eurocode 7
Abstract : Geotechnical engineering is strongly associated with large uncertainties. Geotechnical site investigations are made only at discrete points and most of a soil volume is never tested. A major issue is therefore how to cost effectively reduce geotechnical uncertainties with respect to structural performance. READ MORE
-
8. LCA and LCCA in the design of geotechnical engineering works
Abstract : Geotechnical engineering works are part of almost all construction and infrastructure projects. The geotechnical engineering work contributes to the impact on the environment and gives rise to costs throughout its life cycle. READ MORE
-
9. Geotechnical risk management using the observational method
Abstract : There have been many cost overruns, time delays and quality problems reported from geotechnical engineering projects around the world during recent decades. Many of the reported problems are associated with risks related to the geotechnical conditions. READ MORE