Search for dissertations about: "cost time management"

Showing result 1 - 5 of 404 swedish dissertations containing the words cost time management.

  1. 1. Solid waste management based on cost-benefit analysis using the WAMED model

    Author : Viacheslav Mutavchi; Jan Stenis; William Hogland; Torleif Bramryd; Linnéuniversitetet; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; Economic models; economic incentives; solid waste management SWM schemes; baling economics; municipal solid waste MSW management; ecological– economic efficiency ECO-EE ; cost-benefit analysis CBA ; full cost accounting FCA analysis; the WAMED model; the COSTBUSTER model; the EUROPE model.; Environmental technology; Miljöteknik; Business administration; Företagsekonomi;

    Abstract : Efficient waste management enables the protection of human health, reducing environmental pollution, saving of natural resources, and achieving sustainable and profitable management of energy. In many countries, the general guidelines for waste management are set by national or local waste management plans. READ MORE

  2. 2. Risk management in construction projects : a comparative study of the different procurement options in Sweden

    Author : Ekaterina Osipova; Luleå tekniska universitet; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Construction Engineering and Management; Byggproduktion;

    Abstract : Risks have a significant impact on a construction project's performance in terms of cost, time and quality. As the size and complexity of the projects have increased, an ability to manage risks throughout the construction process has become a central element preventing unwanted consequences. READ MORE

  3. 3. Sensitivity, Variation, and Application of Least-Cost Path Models in Landscape Connectivity Analysis and Corridor Planning

    Author : Rachel Mundeli Murekatete; Takeshi Shirabe; Gyözö Gidofalvi; Jean Pierre Bizimana; Gerhard Navratil; KTH; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; NATURVETENSKAP; NATURAL SCIENCES; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Landscape connectivity; Conservation corridor; Stepping stones; Effective distance; Geographic Information Systems; Raster data; Land evaluation; Suitability analysis; Cost surface; Suitability surface; Ordinal scale; Least-cost path; Spatial resolution; Landskapsanslutning; Bevarandekorridor; Stegbräda; Effektivt avstånd; Geografiska informationssystem; Rasterdata; Markutvärdering; Lämplighetsanalys; Kostnadsyta; Lämplighetsyta; Ordinal skala; Lägsta kostnadsväg; Rumslig upplösning; Geoinformatik; Geoinformatics;

    Abstract : In recent decades, Rwanda has been affected by the loss and fragmentation of natural habitats for native species of animals and plants. As a consequence, landscape connectivity—i.e. READ MORE

  4. 4. Data based configuration decisions in hospital construction projects

    Author : Pia Schönbeck; Anders Ansell; Malin Löfsjögård; Carmel Lindkvist; KTH; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Information management; Configuration management; Decision support; Hospital buildings; Concrete Structures; Betongbyggnad;

    Abstract : The purpose of hospital buildings is to enable the diagnosis, treatment and caring of patients. Hospital configurations are therefore complex and deficient functionality at the final delivery of construction projects are a known issue. Configuration management is essential to ensure that all required functions are fulfilled. READ MORE

  5. 5. Project management ontology : the organizational learning perspective

    Author : Heli Aramo-Immonen; Kaj U. Koskinen; Jari Palomäki; Finland Tampere Tampere University of Technology; []
    Keywords : SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; Mega-project; project learning; organizational learning; systems thinking; activity theory; management ontology;

    Abstract : In a recent interview with the Financial Times, the chief executive of Royal Dutch Shell, Mr. Jeroen van der Veer, said he “keeps faith in ‘elephant’ projects” referring to the Russian gas mega-project that Shell had fallen eight months behind schedule with and had cost overruns twice the original estimate. Mr. READ MORE