Search for dissertations about: "multi-stage multi-level production-inventory planning"
Found 2 swedish dissertations containing the words multi-stage multi-level production-inventory planning.
-
1. Capacity Constraints in Multi-Stage Production-Inventory Systems : Applying Material Requirments Planning Theory
Abstract : In this thesis, capacity-constrained aspects of multi-level, multi-stage productionplanning are investigated. The aim has been to extend Material Requirements Planning Theory (MRP Theory) to cover more general problems dealing with capacity constraints, in particular when non-zero lead times are present and the processes take place in continuous time. READ MORE
-
2. Capacity-constrained production-inventory systems : using Laplace transforms and input-output analysis
Abstract : This work is concerned with multi-level, multi-stage capacity-constrained production-inventory problems. The aim is to provide a contribution to a theoretical background for Material Requirements Planning (MRP) using the Laplace Transform approach and Input-Output Analysis. READ MORE