Search for dissertations about: "project management success IT"

Showing result 1 - 5 of 54 swedish dissertations containing the words project management success IT.

  1. 1. External Stakeholder Analysis in Construction Project Management

    Author : Stefan Olander; Byggproduktion; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Anläggningsteknik; stakeholder management; construction projects; stakeholders; project management; Commercial and industrial economics; property development; Industriell ekonomi; Construction technology;

    Abstract : The planning and construction of a facility can affect several interests. Positive effects are, for instance, better communications, better housing and a higher standard of living. However, construction projects inevitably bring varying degrees of deterioration and change at the local level, not least at the construction site. READ MORE

  2. 2. Exploring Third-Party Logistics and Partnering in Construction : A Supply Chain Management Perspective

    Author : Andreas Ekeskär; Martin Rudberg; Per Erik Eriksson; Linköpings universitet; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; Case study; construction; construction management; construction industry; supply chain management; logistics; third-party logistics; logistics management; partnering;

    Abstract : The construction industry is associated with problems such as low productivity and high costs. This has been highlighted in several government-funded reports in both Sweden and in the UK during the course of over two decades. READ MORE

  3. 3. Integrated structural and construction engineering – A study of project team performance in Swedish bridge design

    Author : Daniel P T Ekström; Chalmers tekniska högskola; []
    Keywords : TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; constructability; project competence; integrated project teams; conceptual design; sustainability; interprofessional dialogue; project culture; collaboration in construction; bridges; integration in construction; concrete structures; integrated design; pre-construction indicators; performance; structural design; inter-disciplinary; buildability;

    Abstract : The Swedish Transport Administration (STA) ambitiously strives to increase the level of productivity and innovation within its operations while meeting and surpassing national sustainability objectives. In this effort, the STA has concluded that climate gas emissions from construction, operation, and maintenance of the infrastructure must be reduced for Sweden to maintain its position as a pioneer and to reach both national and global climate goals. READ MORE

  4. 4. Process oriented information management in construction

    Author : Christian Lindfors; KTH; []
    Keywords : process orientation; information system; information system success; information management; project management;

    Abstract : The construction industry is often accused of beingfragmented and inefficient in nature due to the lack ofcontinuity and repetitive behaviour in projects. For many yearsinformation technology has been put forward as a solution. But,despite the potentials, little gains have been harvested by thedevelopment of computerised information systems (IS). READ MORE

  5. 5. Towards systematic improvement work in project-based organizations : An efficiency and effectiveness perspective

    Author : Erik Sundqvist; Diana Chronéer; Fredrik Backlund; Tina Karrbom Gustavsson; Luleå tekniska universitet; []
    Keywords : SAMHÄLLSVETENSKAP; SOCIAL SCIENCES; TEKNIK OCH TEKNOLOGIER; ENGINEERING AND TECHNOLOGY; Project Management; Project-based organization; Efficiency; Effectiveness; Improvement; Kvalitetsteknik; Quality Technology Management;

    Abstract : Project-based organizations (PBOs) have adopted projects as a primary tool for carrying out most of their operations. By doing so, the PBO operates mainly on two organizational levels, the project level and the organizational level. READ MORE