Search for dissertations about: "reliability and maintenance case study"
Showing result 1 - 5 of 71 swedish dissertations containing the words reliability and maintenance case study.
-
1. Data-driven predictive maintenance planning and scheduling
Abstract : The railway track network is one of the major modes of transportation and among a country’s most valuable infrastructure assets. Maintenance and renewal of railway infrastructure have a vital role in safety performance, the quality of the ride, train punctuality, and the life cycle cost of assets. READ MORE
-
2. Maintenance-related incidents and accidents : aspects of hazard identification
Abstract : The satisfaction of stakeholders depends upon the fulfilment of their requirements. Two important stakeholder requirements related to technical systems are dependability and safety. However, system operation will gradually impair its performance leading to potentially hazardous states of the system. READ MORE
-
3. Models and meaning : on management models and systems of meaning when implementing change
Abstract : Change has become a vital business partner for many organizations. Survival of most organizations depends on their ability to implement adequate changes to support the organization. This thesis deals with questions about measurement systems, process based system models and organizational change with a specific focus on implementation challenges. READ MORE
-
4. Needs and expectations of inbound tourists visiting a peripheral area : a case study in northern Sweden
Abstract : Tourism is the world's largest industry. It has power to change communities and has a large societal impact. The tourism industry is rapidly growing and by 2011 it is projected to generate 7.0 trillion USD of economic activity and 260 million jobs over the world. READ MORE
-
5. Towards systematic improvement work in project-based organizations : An efficiency and effectiveness perspective
Abstract : Project-based organizations (PBOs) have adopted projects as a primary tool for carrying out most of their operations. By doing so, the PBO operates mainly on two organizational levels, the project level and the organizational level. READ MORE
